Five Volume control with membrane switch seat heater 1. Composition Two heating pads, one wire harness, one controller, one five volume control membrane switch. 2. Installation (1) First, take off the cover of the seat, then fix the pads on the back and bottom of the seat separately, put the electrode of pads through the middle gap of bottom and back to under the seat evenly.. ready for connect with controller (2) Plug-in the two plugs from controller to the two plugs from pads under the seat, fix the controller under the seat with bond strip, fix the loose or longer cables under the seat with bond strip too, lay the cable under the carpet to the underside of fuses holder, connect with power after the membrane switch sticked. (3) Put the membrane switch along the side of the seat, which is the side that safety belt with socket, go along the right side of the driver, left side of the side-driver, go along under the seat slide, not above the seat slide, otherwise it may press and cut off the switch wire with running failure. Take away the protection paper on the back of the membrane, stick the membrane switch at the side of safety belt, main seat is at the side near to driver, side seat is at the side near to side-driver. Stick it with correct and solid, then you start connect the power cable. (4) The connection of power cable, First, connect the black wire to the ground line, such the position where the screw nut contact with car to assure the good touch between black wire and car. If there is a screw nut on the car and there is paint on it, you should cut off the paint first then connect the black line under the nut, the black wire should be pressed solidly and no loose. Now you may connect for red wire, to find a wire which can transmit at least 10A current under the dashboard and the diameter is at least 0.06inch and the current is 0 while car is not working, or put the red wire at the position under the fuse socket which marked 10A. The way of finding such wire, turn the multimeter to 20V, switch on the mulitimeter, connect the black pen with ground line, red pen connect the point The place you connect to should not have a voltage when the car is not working. When the car is not working there is 0V on the screen, when the car is working the voltage should be at least 12V.That means this is the right place. You may start to run the system after the wire located and red wire fixed. 3. How to use (1). Start the car first, press the membrane switch 6 times, the indicators will be changed according to this way, red indicator brighten up, green indicator brighten up, both red and green indicator brighten up, red indicator flash, green indicator flash, both indictor extinguish, it means the seat heater is running at 5 volume different temperature allocated. (2). First time enter cab in winter, first press switch once, the temperature is set up in highest temperature, after heating up
词条
词条说明
从**市场角度来看,橡胶产业的后期发展以及橡胶价格的走向也都存在诸多变数。特别是在被称为欧债危机至今,市场将迎来一系列重大事件的考验,**经济也将面临方向选择。一旦出现较大的利空消息乃至危机,橡胶市场的供需格局必将打破,而橡胶价格也将面临新的抉择。 由此可见,橡胶产业将面临严峻的挑战和考验,而反映橡胶产业发展状况的橡胶价格也必将出现新的变化。因此,有关*建议国内橡胶企业应密切关注橡
上图为中商情报网统计数字 进入三月,国内天然橡胶跌势已经延续半月,截止目前市场仍无明显止跌反弹迹象,反而更多利空消息制压市场。市场参与者心态冰火两重天,有部分商家认为天胶下跌时日已久,利空出尽之后将可能迎来利好;而也有另外“空军”*认为,价格的回暖必须来源于需求的支撑,短期需求回暖力度不强,因而可能延续跌势。 “需求”的确是一个至关重要的引爆天胶上涨元素,但从各方面反映的库存情况来
管道堵水气囊,由增强天然橡胶制成,每一个管道堵水气囊在交付前,都会在1.5 倍的额定工作压力和相应型号的管径条件下进行测试。为保证管道堵水气囊结构的强度,我们采用三倍于管封器额定工作压力的安全系数。 &
橡胶充气芯模入模前,须在地面试充气以检查芯模在上次施工中是否损坏、漏气,确保拉入的芯模完好,以免在浇注混凝土的过程中造成质量隐患。为保证板梁钢筋的保护层及板梁空腔部分尺寸符合设计及规范要求,避免芯模在浇筑混凝土的过程中上浮,使用定位环箍钢筋进行固定;在芯模就位后,打开进气阀门,用空压机充气。充气时用压力表控制监测气压,芯模充气压力根据型号定。当气压达到使用压力时,将气阀
公司名: 衡水金晨橡塑制品商贸有限公司
联系人: 金红
电 话: 0318-8080011
手 机: 15610813366
微 信: 15610813366
地 址: 河北衡水衡水市开发区
邮 编: 053000
网 址: hstzxj.cn.b2b168.com
公司名: 衡水金晨橡塑制品商贸有限公司
联系人: 金红
手 机: 15610813366
电 话: 0318-8080011
地 址: 河北衡水衡水市开发区
邮 编: 053000
网 址: hstzxj.cn.b2b168.com